Help Center
Click to Home
Go To Search
Division III - Surface Collection & Conveyance and Streetscaping
Division III - Surface Collection & Conveyance and Streetscaping

Conceptual design plans have been completed (see below) and final design plans have begun on the final phase of the Market Street project, Division III, improvements to the surface collection and conveyance system on North and South Market Streets. The existing stormwater collection and conveyance system would be completely replaced and connected to the three drop shafts. (The brick arches, due to their historic significance, will be left intact.) This Division, which will require extensive planning and close coordination, will be in conjunction with a streetscape project for the Market area and will most likely begin sometime in 2018. 

Market Street Streetscape Conceptual Plans



Market St Streetscape Conceptual Plan Flyover




Market St Streetscape Conceptual Plan Street View

Steven A. Kirk, P.E.
Senior Engineering Project Manager
Email

2 George Street
Suite 2100
Charleston, SC 29401

Ph: 843-579-7682
Fx: 843-973-7261