Conceptual design plans have already begun on the final phase of the Market Street project, Division III, improvements to the surface collection and conveyance system on North and South Market Streets. The existing stormwater collection and conveyance system would be completely replaced and connected to the three drop shafts. (The brick arches, due to their historic significance, will be left intact.) This Division, which will require extensive planning and close coordination, will be in conjunction with a streetscape project for the Market area and will most likely begin late 2016. 