Heathwood Drive Drainage Improvement

The Heathwood Drive Drainage Improvements will consist of installing more than 550 linear feet of new stormwater pipe to move stormwater more efficiently from an existing drainage ditch north of Fairfield Drive to the existing 48-inch reinforced concrete pipe (RCP) at Autumn Lane, replacing the existing roadside ditches where the pipe is being installed. The project also includes some minor utility relocations, installation of 7 drop inlets for the affected properties, and other associated work. The project will provide more effective drainage for this portion of Heathwood Drive and alleviate the long-term standing water on Elton Court.

Area map (PDF)