Documents and Maps

(Below is a list of all past and present documents and maps pertaining to the Cooper/Jackson Improvements Project. )


Cooper Jackson Drainage Basin BoundaryCurrent Flooding Hotspots

Post Improvement Flooding Hotspots

Cleaning

5.5 x 7.5


  1. Benjamin Smith, PE

    Senior Engineering Project Manager

  2. Robin Kidd

    Stormwater Outreach Coordinator

  3. Stormwater Management

    Physical Address
    2 George St
    Suite 2100
    Charleston, SC 29401

    Mailing Address

    Charleston, SC 29402